Completed

Colmar, PA

The 87,000 square-foot, 3-story North Penn project in Colmar, PA, required the demolition and removal of a 32,000 square-foot existing building, an existing slab of more than 18,000 square feet, plus several tons of unsuitable soils. The finished structure includes a new slab, two elevators, a covered loading/unloading area on the first floor – and […]

Thomasville, PA

Moove-In Self Storage’s 24,000 square-foot expansion in Thomasville, PA, is the addition to an existing facility.

Gilbertsville, PA

This three-phase, multi-story construction project in Gilbertsville, PA is made up of more than 86,000 square feet and 9 buildings.

Avondale, PA

The Avondale facility is new construction, consisting of four structures containing 760 temperature-controlled and drive-up self-storage units.

Pottstown, PA

The transformation of the Pottstown, PA, property shows the positive impact conversions can have on an old site.  The existing structure, a former auto dealership, was renovated to yield 170 indoor self-storage units in a great location.

Allentown, PA

The Budget Store & Lock Project in Allentown is a perfect example of how efficiency and creative problem solving were used to keep a project from missing a prime rental season. The project got underway in the late fall of 2018, right around the time that temperatures were beginning to dip, and when other builders […]

Lititz, PA

The Moove In Self Storage project began as an existing 20,000 square-foot, drive-up storage facility, and an adjoining motorcycle repair shop. The plans involved the removal of those two buildings, and the construction of a new, three-story building with two above-ground levels, and one underground level. The project included the reinforcing of an embankment that […]

Bear, DE

Expansion potential is an exciting opportunity for a self-storage owner.  As the customer base increases, it can be beneficial to expand the facility to accommodate. On this project, our team was able to advise ownership on possibilities for the property and complete the job. This project involved adding two buildings. The property is paved and […]

Primos, PA

The transformation of the Primos, PA property shows the positive impact conversions can have on an old property. The existing structures were renovated, and two additional buildings were built. This created space for over 800 self-storage units in a great location. Formerly a newspaper headquarters, the facility offered a bonus feature that carries over to […]

Quarryville, PA

Visible from the road at the Quarryville facility is an office building that can be mistaken for a barn.  Behind the “barn” are numerous single-story storage buildings. The unique lot shape is fully utilized with the buildings being laid out one behind the other on an incline.

Kutztown, PA

The Kutztown facility is a new construction, outfitted with a unique facade made of masonry and metal. The two structures contain 180 self-storage units.

Southampton, PA

Originally a manufacturing facility, this 52,000 square foot building was converted into a self-storage facility with 374 units. A unique second story mezzanine system was added to increase square footage. The orange doors offer a bright pop of color in this facility.

Phoenixville, PA

To gauge market demand and to match the timing of investment with rentals, a self-storage facility build can be done in multiple phases. For a sizeable, 85,000 square foot facility with two, three-story buildings, like in Phoenixville, it was done in two phases. The first phase involved the construction of a three-story structure that was […]

Coatesville, PA

The conversion of this former printing and paper warehouse building into self-storage created a new purpose for an otherwise empty structure. The Coatesville facility offers interior units all of which are temperature controlled.

Royersford, PA

Some facilities require certain cosmetic finishes to acquire construction approval. This project was outfitted with decorative elements to make it blend into the surrounding retail buildings. Phase I was completed in 2017. The project involved constructing four buildings, one of which is a two-story structure. It features a combination of temperature and non-temperature controlled units, […]