Multi-Story

Colmar, PA

(June 22, 2022) The 87,000 square-foot, 3-story North Penn project in Colmar, PA, was completed in May 2022. This new facility required the demolition and removal of a 32,000 square-foot existing building, an existing slab of more than 18,000 square feet, plus several tons of unsuitable soils. The finished structure includes a new slab, two […]

Gilbertsville, PA

This newly completed (April 2022) three-phase, multiple-story construction project in Gilbertsville, PA is made up of more than 86,000 square feet and 9 buildings.

Avondale, PA

The Avondale facility is new construction, consisting of four structures containing 760 temperature-controlled and drive-up self-storage units.

Lititz, PA

The Moove In Self Storage project began as an existing 20,000 square-foot, drive-up storage facility, and an adjoining motorcycle repair shop. The plans involved the removal of those two buildings, and the construction of a new, three-story building with two above-ground levels, and one underground level. The project included the reinforcing of an embankment that […]

Phoenixville, PA

To gauge market demand and to match the timing of investment with rentals, a self-storage facility build can be done in multiple phases. For a sizeable, 85,000 square foot facility with two, three-story buildings, like in Phoenixville, it was done in two phases. The first phase involved the construction of a three-story structure that was […]

Royersford, PA

Some facilities require certain cosmetic finishes to acquire construction approval. This project was outfitted with decorative elements to make it blend into the surrounding retail buildings. Phase I was completed in 2017. The project involved constructing four buildings, one of which is a two-story structure. It features a combination of temperature and non-temperature controlled units, […]